Installation Instructions
1. Preparation of the wall surfaces
Make sure the wall surfaces to be smooth,flat,solid,dry and perfectly clean.We suggest creating a white base about 2mm.
2. Preparation for laying
Score lines on the surfaces to help the sheet posited correctly.
3. Laying
Using the straight of a trowel spread out the adhesive uniformly on the wall.Make sure the adhesive covered all the surface .One time should be not more than 1m2.
A¡ª Mosaic mounted on paper
Install the mosaic sheets with the paper side facing towards you and then using rubber float to ensure perfected adhesion.Wet the paper with a damp sponge and the remove it gently .Take out of any excess adhesive before it dries by a small spatula.
B--- Mosaic mounted on mesh,Press the fiberglass mesh backing directly into the adhesive.
4. Grouting
Using a grout for particular care.For paper-faced mosaic,ensure that tiles are thoroughly cleaned and spread the grout using a rubber float.Make sure no more than 2m2 of area at a time.And the leave the grout drying.
5. Cleaning
Using a damp sponge to remove any grout.
6. Cutting glass mosaic
Using mosaic nippers cut tile by tile.
Using a cutter for cutting the whole sheet.
7. Maintenance
Using normal neutral detergents for daily cleaning.
Using a slightly acidic detergents for special cleaning.
¡ôThe following instructions are for laying mosaics in swimming pool
Make sure the pool is dry and a static test has been carried out on the structure.No water is covered for at least 20 days after laying has been completed.Keeping the substrete temperature between 5¡æ-30¡æ.
Grind down irregularities in the concrete with wire brushes or a flexgrinder.
For special or heavy-duty cleaning .We recommend using a slightly acidic detergent.
|